Tender For supply of split ac 1.5 ton 5 star inverter ac nominal cooling capacity in ton /(kcal/hr): 1.5 ton /4500 kcal/hr. coil material copper with installation and comissioning. warranty of machine: 1 year, warranty of compressor: - 05 years . make - voltas , lg, panasonic, lloyed, hitachi, or similar. [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply of air cooled package unit , make - voltas , esr-iii melt-i air cooled chiller unit, make - as per annexure , vim 600 kg melt-ii air cooled chiller unit, make - delimon , var-iii melt-iii air cooled chiller unit, make - riedel , melt 6.5t melt-iii chiller, capacity - 24.0tr , var 4 chiller titanium , make - vanguard , var 1 chiller titanium , make - vanguard , ebm-150 bar and wire drawing , ebm-300 bar and wire drawing , ring rolling machine forge chiller , qcl chiller air cooled, make - vanguard instron , qcl biss mcs maruti coolingsystems , qcl cryogenic chiller , qcl metallo graphy chiller , fastener chiller, make - advance coolingsystems pvt.ltd , crm water jet cut machine chillers , air cooled package unit capacity - 11.0tr , air cooled package unit capacity - 8.5tr , air cooled package unit capacity - 5.5tr , melt-iii vim 8t, capacity - 60.0tr
Tender For tender for supply of supply installation testing and commissioning of cat6 utp cable 23 awg solid copper 4 pair utp pvc frls for data cabling in mtrs , supply installation testing and commissioning of information outlet and faceplate 2 port 1 port modular faceplate with shutter workstation and telephone points , supply installation testing and commissioning of back box pvc or metal wall mount suitable for modular faceplate all data and voice points , supply installation testing and commissioning of cat6 i o keystone jack wall mount suitable for jack all data & voice points , supply installation testing and commissioning of patch panel 24 port cat6 24port loaded patch panel with cable management bar network rack per floor , supply installation testing and commissioning of patch cord data 1m factory molded certified cat6 workstation to io and rack termination , supply installation testing and commissioning of patch cord data 2m factory molded certified cat6 workstation to io and rack termination , supply installation testing and commissioning of fiber cable 6 core multi mode armoured multi mode om3 mm armoured fiber cable backbone between floors racks , supply installation testing and commissioning of liu fiber termination box 6 port with pigtails rack end termination 2x3 , supply installation testing and commissioning of fiber patch cord data 3 mtr duplex multimode fiber patch cord lc to lc workstation to io and rack termination , supply installation testing and commissioning of sfp moudule duplex multimode sfp rack termination to rack termination , supply installation testing and commissioning of smart managed switch l2 24 port gigabit 24 x 1g rj45 4 x sfp vlan qos snmp per floor distribution switch 2x6 , supply installation testing and commissioning of smart managed switch l2 48 port gigabit 48 x 1g rj45 4 x sfp vlan qos snmp per floor distribution switch 1x6 , supply installation testing and commissioning of 16port gigabit unmanaged poe switch 16 x 1g rj45 , supply installation testing and commissioning of network rack 27u floor mount with power distribution unit pdu 27u 800mm depth glass door cooling fan pdu floor department network room , supply installation testing and commissioning of accessories n consumables horizontal cable managers as per installation requirement , supply installation testing and commissioning of accessories nconsumables 1u horizontal cable tray as per installation requirement , supply installation testing and commissioning of one time installtion as per installation requirement , supply installation testing and commissioning of ubiquiti udm machine pro controller 10g cloud gateway with 100 unifi device 1000 client support 1.3 inch touchscreen server room wifi controller , supply installation testing and commissioning of ubiquiti unifi 6 long range access point poe adapter not included lr us high rage wifi , supply installation testing and commissioning of ubiquiti unifi u6 access point poe adapter not included u6 plus low range wifi , supply installation testing and commissioning of one time installtion as per installation requirement , supply installation testing and commissioning of 2mp ip camera dome for indoor , supply installation testing and commissioning of nvr 32 channel server control room , supply installation testing and commissioning of hard disk sata 10 tb hdd expandable h265 60 days backup server control room , supply installation testing and commissioning of 4k hdmi 20 meter cable hdmi 2pnt0 v cable with ethernet 3d supported tv projector hdmi cable , supply installation testing and commissioning of 4x1 hdmi switcher with audio hdmi switch 4 in 1 out 4k 60hz splitter bi directional 2 input 1 output support hdmi cable , supply installation testing and commissioning of one time installtion labour installtion labels ferrules tags services , supply installation testing and commissioning of ups system waveform sine wave capacity 40000 va input phase 3 phase output phase 3 phase warrant
Tender For auction sale of household goods - s. n. descriptionquantityunitiratevalue(approximate)capacity(rs.)1ceiling fan4150 watt30012002three seater sofa with130003000table with two chair318" lg t.v.1100010004lg double door fridge1300030005gas chulha1500500iron almirah1150015007double bed with side table2wooden30006000washing machine 6.5 ltr.1200020009chapati tava, cooking pan20020010kitchen utensils50050011plastic chair220040012cooler with stand21500150013wall clock25010014curtain210020015suitcase615090016speaker with stool150050017press210020018glass kitchen set150050019steel balti with rob120020020inverter microtek1piece1000100021dressing table11000100022pooja table2500100023pooja storage150050024dining table with six chair14000400025microwave11000100026 ro 1 1000 100027 geyser1 1000 100028 wooden storage1 500 500\29 iron sandook1 500 500 30 cooling fan1 500 500total value35.900
Tender For supply of set of gaskets for mrb and tmb, set consist of 3 items as given below 1) top gasket for machine room blower duct as per drg no-c/els/lgd/rc/4/19.alt 1 or latest-01 no/set. 2) bottom gasket for machine room blower duct as per drg no-c/els/lgd/rc/4/20, alt. 1 or latest-1 no/set 3) set of top and bottom gasket for traction motor cooling blower duct as per drg. no- c/els/lgd/aux4/61 each 1 no/set [ warranty period: 30 months after the date of delivery ]
Tender For fabrication work d d - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of sulfur furnace , makin